Different between pre-tensioning and post-tensioning members
These methods are used under the pre-stressing process which has few edges over the orthodox non-stressed structures like greater span to depth ratio, higher moment, and shear capacity. These methods are generally adopted in the making of PSC girders, sleepers, etc.
S.N | Pre-tensioning | post-tensioning |
1 | In this method, the concrete is prestressed with tendons before it is placing in position. | In this method prestressing is done after the concrete attains sufficient strength. |
2 | This method is developed due to the bonding between the concrete and steel tendons. | This method is developed due to bearing. |
3 | Pre-tensioning is preferred when the structure element is small and easy to transport. | Post-tensioning is preferred when the structure element is heavy. |
4 | In this method, similar prestressed members are prepared. | In this method, products are changed according to the structure. |
5 | Prestressed members are produced in mould and then transported. | Cables are used in place of wire and jacks are used for stretching. |
6 | Its size is limited. | Its size is not limited. |
7 | It is cheaper to construct. | It is costlier. |
8 | It is more durable. | It depends on their construction mechanism. |
9 | In this process, Members are tensioned at first and then cast. | In this process, Members are cast first and then tensioned. |
10 | Culverts, girders are constructed. | Long bridge, buildings with long-span beam are constructed. |
1) Concept, Place
2) Size, Members, Suitability
3) Durability, Loss in Prestress, Cost
4) Size
I hope this article on “Different between pre tensioning and post tensioning of concrete Structure” remains helpful for you.
Happy Learning – Civil Concept
Contributed by,
Civil Engineer – Ranjeet Sahani
Read Also,
How to Calculate the Modulus of elasticity of concrete?
Effect of water cement ratio and Aggregate Size on Strength of Concrete
Concrete cube test Procedure | Strength of Concrete at with Passing Time